LabTest Certification Inc.
MENUMENU
  • Home
  • Services
    • Testing & Certification
      • Environmental
      • PPE
      • Hazardous Locations
      • EMC
      • Marine
      • Medical
      • Vibration
      • Electrical
      • Energy Efficiency
      • Solar
      • Building Materials
      • Fuel Burning
      • Plumbing
      • IP Rating
    • Field Evaluations
      • Field Evaluations
      • Special Inspections
        • CSA SPE 1000
        • CSA SPE 3000
        • CSA B149.3
    • How To
      • Get Started
      • Certification Program
    • International
      • International Approvals
    • Certification & Training
      • Management System Services
      • Hazloc Training
    • LabTest Certification Inc. | Call or Email Today for a Quote.
  • Accreditations
  • Careers
  • Media
    • Podcasts
    • Videos
  • About
    • About
      • About LabTest
      • President’s Message
      • News
    • Events
      • Community
    • Clients & Marks
      • Testimonials
      • LC Marks
  • Request A Quote
    • Request For Quote
      • Environmental
      • Electrical
      • Respirators
      • Fenestration
      • Solar Collectors
      • Hazardous Locations
      • Fire Testing
      • SDHW Systems
      • EMC
      • Fire Doors
      • Plumbing
      • Electrical & EMC
      • Sanitation
      • Vibration
      • Radio Frequency
      • Fuel Burning
    • Request For Information
      • Request For Information
    • Field Evaluations
      • Electrical
      • Fuel Burning
  • LC Directory
  • FAQ
  • Contact
  • Home
  • RFQ – Fuel Burning Field Evaluation

RFQ – Fuel Burning Field Evaluation

  • Applicant Information for Fuel Burning Field Evaluations

  • Inspection Location

    If different than Applicant Information
  • Product Information

  • Drawings with BOM of components/fittings · Product schematics · Block diagram · Previous test data & reports · Product photograph(s) · Operating manual · Target completion date · Installation manual
  • Manufacturer to provide the following:

    Related to the Programmable Ignition Controller: A letter from a Professional Engineer as defined in the applicable Provincial Engineers Act confirming the system has been reviewed by him/her and that it complies with section 9.7 of CSA B149.3-15 Field Approval Code; Functional logic diagrams complete with timer and counter presets; Power distribution drawings; A list of all error and alarm messages, their meaning, and suggested operator reactions; A description of the microprocessor-based system and BMS operation; Training arrangements; Security procedures, privileges level, and assignments; and At the time of commissioning and site verification, an electronic copy of the as-built system program code.
  • Markings:

    Markings If not permanently molded into enclosure or die stamped on a plate riveted to the enclosure, require certificate of compliance of the label manufacturer AND distributor.
  • This field is for validation purposes and should be left unchanged.

Translate to another language


Download Information Materials

  • LabTest Booklet
  • What We Do
  • EMC
  • Environmental
  • Building Materials
    • Fire Testing
    • Fenestration
  • Fuel Burning
  • Hazardous Locations
    • Hazloc Training
  • Plumbing
  • Solar
  • Field Evaluations
  • Lighting
  • Management System Services

© 2020 LabTest Certification Inc.

  • This field is for validation purposes and should be left unchanged.